Tuesday
I have removed the forms from the last two column caps, installed the 4 x 4 post bases, and acid washed all 6 columns to remove the excess mortar and stains.

I also hauled some pallets from the Holowai lot and painted the 4 x 4 posts and 4 x 10 beams.
TTFN