Saturday
I set up the forms between the columns of the gazebo for two more sections to be poured with concrete.

I poured one section and needed more sand and water, so I did a sand/water run into town. When I returned, I had the materials for another section, maybe tomorrow This makes three of the six necessary sections are completed.

I also worked some more on moving the pile of delivered gravel and leveling the driveway.
TTFN