A New Bathroom

September 5, 2024

Excerpt from prervious post:

I took pictures of all this using my phone. I download the photos to a thumb drive so I can attach them here later. When I create these postings, I use the pictures to help me remember what I did each day. Well, I cannot find the thumb drive that I downloaded pictures for August and half of September. I had it on October 7th when I was packing up to leave Hawaii, but I cannot find it now. Perhaps I need to not wait so long inthe future, to create these posts. At this point I will have to pick up with the pictures that are still on my phone and hope to be able to find the thumbdrive later.

This post starts with the pictures i still had on my phone.

Previously, I have been building columns on the side of the kitchen gazebo towards Holowai Street to expand the kitchen area. Here is a picture of the columns built, and one column cap formed ready to pour as well as a second section of the floor between the two new columns. I have already poured one section from the existing gazebo out to one of the new columns.

Additionally, I had also begun building a bathroom at the Holowai property – one that will drain into the septic tank. I set up forms to pour a section of the floor around the perimiter of the bathroom as a “foundation” for the walls and to identify the area of the bathroom.

I poured concrete into these forms in sections. It took three pours.

TTFN