September 8, 2024
After struggling with trying to come up with a clever pattern for the floor of the bathroom, I decided to just keep it simple. Just four sections. So, I set up forms to be able to pour two of the four sections.

When I had the gravel/sand mix delivered to Holowai, I had him dump it into two piles – one on each side of the driveway, The last time I had a load delivered, they dumped it in one pile that extended halfway out into the area of the road where people drove. I hoped that by dumping it into two piles, it would not block the roadway as much.

I have been working on moving the smaller of the two piles – separating the smaller stuff from the larger rocks. I dumped the smaller stuff in a pile about 30 feet inside the gates. The larger rocks, I have used as backfill material around the block walls. Today, I moved the last of the smaller pile.

I dumped the larger rocks here to fill this area and backfill next to the block walls.

It has spilled out around the corner.

I set up forms to pour a third section of the floor for the gazebo extension.

the tops of the columns are also ready to create a concrete cap on them.
TTFN