December 1, 2024 The blockwork for the walls of the bathroom at Holowai has been completed. I wanted to build the first two feet out of concrete block to get it above the level of the surrounding ground. I’ll grout the cells and pour a concrete cap on top of these walls. Then build frameContinue reading “And Into December”
Category Archives: Construction
Back to Hawaii
November 23, 2024 The boys are back. Bert and Ernie (or a close facsimile of them) came by for breakfast. While waiting for my lumber delivery to arrive, I set up my hammock. Out by the road seemed like a good spot so I would be aware when the truck arrives. A pallet of blockContinue reading “Back to Hawaii”
My Last Week
October 3, 2024 The last section of the gazebo floor is ready to pour. I haven’t had any more issues with stomach pains at 2:00 AM, but I will go see my doctor when I get back in Arizona. The mixer is set up in the driveway at the road for easy access to theContinue reading “My Last Week”
Less than a Week Left
October 2, 2024 I slept through the night. No 2:00 AM pain. The medication must be working. Or, maybe I had food poisoning from something I ate and it has worked it’s way out of my system! But if that were the case, why did it just happen at 2:00 AM? I have been ableContinue reading “Less than a Week Left”
To End Out The Month
September 28, 2024 Last night, or I should say, this morning, as it was 2:00 AM that I had a repeat of last night’s discomfort. This morning was not as difficult because I knew it would eventually end. But I had the same pain with the same result, except this time I made sure IContinue reading “To End Out The Month”
The Next Three Days
September 26, 2024 The bathroom and the gazebo continue to be my focus. Building forms around the outer edges of the bathroom at Holowai took the better part of the day. These forms are on top of the slab “footings” I started with and will be the basis for the walls. They need to beContinue reading “The Next Three Days”
Need To Ramp It Up
September 24, 2024 In order to pour concrete around the compass rose in the gazebo extension, I found it necessary to build a ramp over the steps to get the wheelbarrow up there. Just an old 4 x 10 beam that is pretty rotten and has a huge crack, and a 2 x 8 plank.Continue reading “Need To Ramp It Up”
Just a Little Trim
September 23, 2024 Adding a bit of red color to the concrete will make the center of the compas rose stand out The weeds and grass was getting too tall at the Ahi driveway, so I took the weed eater and trimmed up around the driveway. While I was at it, I cut down theContinue reading “Just a Little Trim”
Rule the Roost
September 22, 2024 The red headed cardinals are becoming a regular visitor to my feeder. Sometimes they come in pairs, and sometimes they come one at a time. m Inevitably, they are followed by the larger Northern Red Cardinal who prefers to chase all the other birds away and tries to rule the roost, soContinue reading “Rule the Roost”
All For The Birds
September 21, 2024 First, there was one. But it didn’t take long until there were at least five birds partaking of the offerings in the bird feeder. The Hawaiian Honeycreepers seem to have taken over by sheer numbers. They even tend to hold their own with the larger Northern Red Cardinal . . . asContinue reading “All For The Birds”