December 1, 2024 The blockwork for the walls of the bathroom at Holowai has been completed. I wanted to build the first two feet out of concrete block to get it above the level of the surrounding ground. I’ll grout the cells and pour a concrete cap on top of these walls. Then build frameContinue reading “And Into December”
Tag Archives: block work
Last Week of May
Sunday May 26, 2024 I have decided on a pattern for the floor in the bathroom at Ahi. “X” marks the spot!” I will pour a big “X” from corner to corner. So I poured one leg of the “X”. I set up the mixer at the bottom of the driveway where I have createdContinue reading “Last Week of May”