December 1, 2024 The blockwork for the walls of the bathroom at Holowai has been completed. I wanted to build the first two feet out of concrete block to get it above the level of the surrounding ground. I’ll grout the cells and pour a concrete cap on top of these walls. Then build frameContinue reading “And Into December”
Tag Archives: coastline
September 17, 2023
Sunday Removed the forms from the step I poured at the shower at Ahi and set up forms for the next one. Removed / readjusted the forms from under the gazebo for the eight squares that I poured yesterday. Set up forms for pouring more squares. Drove through town and down towards the ocean at Honuapo. Continue reading “September 17, 2023”