And Into December

December 1, 2024 The blockwork for the walls of the bathroom at Holowai has been completed. I wanted to build the first two feet out of concrete block to get it above the level of the surrounding ground. I’ll grout the cells and pour a concrete cap on top of these walls. Then build frameContinue reading “And Into December”