September 16, 2025 Watered the plants at Holowai Took apart three more pallets Finished installing the blocks between the rafters on the makai side of the roof and started on the driveway side September 17, 2025 Unloaded the pallets and the lumber from the truck. Disassembled 2 pallets. Took the bathrom door over to theContinue reading “Life Goes On”
Tag Archives: roof framing
Alanah Arrives
September 11, 2025 No work today on any projects. I’m going to Kona to pick up Alanah from the airport. She arrives at 1PM via Las Vegas. After picking her up, we stop for gasoline – $3.79 instead of $4.69 in Na’alehu – and at the lumber yard for more 2 x 6 rafters andContinue reading “Alanah Arrives”
September Arrives
September 1, 2025 Installed rebar in the form for the concrete conter in the gazebo. Drilled into the columns at the side to anchor the rebar. Added a bit of fencing as the wire mesh reinforcing. Installed support braces under the forms. It is ready to pour. At the corner of Palaoa Road and AmepelaContinue reading “September Arrives”
Another Week (or so)
January 21, 2025 Worked on the roof framing today. Roof rafters all in place and the fascia is installed. January 22, 2025 Cut and installed bocking between the roof joists over the walls and through the center. Then I began installing the roof deck boards. As this will be a walking deck that will beContinue reading “Another Week (or so)”