September Arrives

September 1, 2025 Installed rebar in the form for the concrete conter in the gazebo. Drilled into the columns at the side to anchor the rebar. Added a bit of fencing as the wire mesh reinforcing. Installed support braces under the forms. It is ready to pour. At the corner of Palaoa Road and AmepelaContinue reading “September Arrives”

September 14, 2023

Thursday Sunny day today My solar system was putting out enough electricity to be ablr to turn on mini fridge and put ice cube trays into freezer compartment. Went over to Ahi and moved more gravel. Driveway is graveled all the way to the back of the “parking area” at the bottom.  The slope of theContinue reading “September 14, 2023”

March 20, 2023

Monday Worked on concrete and rock for corner columns of shower enclosure at Ahi lot. Solar system at Holowai is not keeping up with the refrigerators. Need more panels &/or more batteries. Pulled weeds from another of the footing excavations at Holowai. Went to Honu’apo and went swimming in the swimming pool – even thoughContinue reading “March 20, 2023”