September 1, 2025 Installed rebar in the form for the concrete conter in the gazebo. Drilled into the columns at the side to anchor the rebar. Added a bit of fencing as the wire mesh reinforcing. Installed support braces under the forms. It is ready to pour. At the corner of Palaoa Road and AmepelaContinue reading “September Arrives”