Life Goes On

September 16, 2025 Watered the plants at Holowai Took apart three more pallets Finished installing the blocks between the rafters on the makai side of the roof and started on the driveway side September 17, 2025 Unloaded the pallets and the lumber from the truck. Disassembled 2 pallets. Took the bathrom door over to theContinue reading “Life Goes On”